102 calls inside windows that had not closed at the audit date. Each card carries the window and the state of the call when the audit read it.
OPENC032025-09-06
The call, as published: “SUI adoption strengthens, token price approaches $10. SUIG's NAV expands, and the stock re-rates as the only Nasdaq-listed SUI proxy.”
Window, as published: Advantage window ~12–18 months from 2025-09-06 (to ~2027-03)
State at the audit date, October 29, 2026: Window runs to ~March 2027, so the base case is not yet gradeable as final. The interim trajectory is printed in full: at month 13 the token is 71% below its publication price and roughly 90% below the base case's $10 marker.
OPENC842025-09-27
The call, as published: “Setup: PQ-resilient chains begin gaining premium flows before 2030, once disclosures hit ETF and custody rules.”
Window, as published: before 2030
State at the audit date, October 29, 2026: Stated window (before 2030) has not closed. The trigger the article itself names (disclosures hitting ETF and custody rules) has not occurred yet, so the path is neither settled nor failed.
OPENC872025-09-28
The call, as published: “Option A: Status Quo (2025–2029) — 55% BTC and ETH dominance continues near term. Post-quantum risk remains niche in public narratives while custodians and standards bodies work in the background.”
Window, as published: 2025–2029
State at the audit date, October 29, 2026: Stated window (2025–2029) has not closed; grading now would require shortening the article's own horizon (precedent C11-C13). Interim state printed in the settling event. The article states these options are explicitly not mutually exclusive, so they are graded path by path, not as a partition.
OPENC882025-09-28
The call, as published: “Option B: Regulatory Push (2029–2032) — 70% NIST and related agencies drive adoption. Custodians migrate the resilient cohort. Compliance and disclosure frameworks begin to force the issue.”
Window, as published: 2029–2032
State at the audit date, October 29, 2026: Stated window (2029–2032) has not closed; grading now would require shortening the article's own horizon (precedent C11-C13). Interim state printed in the settling event. The article states these options are explicitly not mutually exclusive, so they are graded path by path, not as a partition.
OPENC892025-09-28
The call, as published: “Option C: Hardware Breakthrough (2030s) — 20% Quantum progress arrives faster than expected. Dormant ECDSA wallets face real exploitation risk. Governance stress rises. This is the low-probability, high-impact tail.”
Window, as published: 2030s
State at the audit date, October 29, 2026: Stated window (2030s) has not closed; grading now would require shortening the article's own horizon (precedent C11-C13). Interim state printed in the settling event. The article states these options are explicitly not mutually exclusive, so they are graded path by path, not as a partition.
OPENC902025-09-28
The call, as published: “Option D: Hybrid Drift (2025–2032) — 45% Interim hybrids and loop strategies buy time. They coexist with A and B as the market bridges toward compliance.”
Window, as published: 2025–2032
State at the audit date, October 29, 2026: Stated window (2025–2032) has not closed; grading now would require shortening the article's own horizon (precedent C11-C13). Interim state printed in the settling event. The article states these options are explicitly not mutually exclusive, so they are graded path by path, not as a partition.
OPENC1032025-11-29
The call, as published: “Tokenized Treasury issuance exceeds 50 billion dollars.”
Window, as published: 2026
State at the audit date, October 29, 2026: Window is calendar 2026 per the article's hardening timeline and has not closed. Interim state printed in full: the marker is failing so far and would require more than a tripling in Q4. Final grade after Dec 31, 2026.
OPENC1052025-11-29
The call, as published: “Stablecoin reserve demand pushes tokenized AUM past 200 billion dollars.”
Window, as published: 2027
State at the audit date, October 29, 2026: Window runs to 2027. Interim state printed in full. Final grade in 2027.
OPENC1062025-11-29
The call, as published: “Stablecoin market reaches 2 trillion dollars.”
Window, as published: 2028
State at the audit date, October 29, 2026: Window runs to 2028. Interim state printed in full: the market would need roughly a 6.7x expansion in the remaining window. Final grade in 2028.
OPENC1072025-11-30
The call, as published: “Expect 40 to 60 percent re-rating by 2028 as governance demand accelerates from the 120 billion dollars stablecoin reserve base.”
Window, as published: by 2028
State at the audit date, October 29, 2026: Window runs to 2028. Interim state printed in full: the re-rating band has not been entered at any point since publication. Final grade in 2028. The grade rests on the Coinbase tape only, not on the article's stablecoin-reserve inputs.
OPENC1082025-12-01
The call, as published: “That implies a price corridor between $240,000 and $360,000.”
Window, as published: before mid-2027
State at the audit date, October 29, 2026: Window runs to mid-2027. Interim trajectory printed in full: at the audit date the price is about 67% below the corridor floor, so the path is failing on its own terms so far, but the window governs and it has not closed.
OPENC1092025-12-03
The call, as published: “Scenario 2. Fragmentation (most likely)”
Window, as published: 2025 to 2028
State at the audit date, October 29, 2026: Stated window 2025 to 2028 has not closed; grading now would require shortening the article's own horizon. Interim state printed in the settling event. Note: the grade rests on external interim evidence only, not on the Dual-Dollar series' own internal figures, which extraction flagged as disputed.
OPENC1102025-12-04
The call, as published: “Digital Collateral Surpasses Bank Deposits”
Window, as published: 2028
State at the audit date, October 29, 2026: Window runs to 2028. Interim state printed in full. Final grade in 2028. Note: this call's article is in the Dual-Dollar series, whose internal figures were flagged as disputed in extraction; the grade rests only on the external interim figures above, not on any figure from the article.
OPENC1112025-12-04
The call, as published: “Private Rails Surpass Fed Rails in Settlement Volume”
Window, as published: 2028
State at the audit date, October 29, 2026: Window runs to 2028. Interim trajectory is printed in full: private-rail volume is growing but sits orders of magnitude below the surpass point. Final grade in 2028.
OPENC1122025-12-04
The call, as published: “Scenario 1: The Fusion Dollar (Most Likely)”
Window, as published: 2028 to 2032
State at the audit date, October 29, 2026: Stated window is 2028 to 2032; grading now would require shortening the article's own horizon.
OPENC1132025-12-06
The call, as published: “One G20 admission resets correlations. The market re-prices sovereign hedging.”
Window, as published: 2026
State at the audit date, October 29, 2026: Window is calendar 2026 and has not closed. The specified trigger (a G20 admission) has not occurred through Oct 18, 2026. Final grade after Dec 31, 2026.
OPENC1142025-12-06
The call, as published: “2026 is when the first big country (Saudi, UAE, Singapore, maybe Japan) will very likely say “yes, we hold Bitcoin” on its official balance sheet. Call it 65% odds.”
Window, as published: 2026
State at the audit date, October 29, 2026: Window is calendar 2026 and has not closed. The call's specific event (an official balance-sheet confirmation by a named first major country) has not occurred through Oct 18, 2026; third-party wallet attribution and sovereign-fund ETF stakes are printed in the settling event and are not adopted as the confirmation the article specified. Final grade after Dec 31, 2026.
OPENC1152026-01-05
The call, as published: “1. Boom: AI delivers, energy scales (45%)”
Window, as published: 2026
State at the audit date, October 29, 2026: Window is calendar 2026 and has not closed. Interim trajectory is printed in full; final grade after Dec 31, 2026.
OPENC1162026-01-05
The call, as published: “2. Bottleneck: adoption stalls, overcapacity builds (30%)”
Window, as published: 2026
State at the audit date, October 29, 2026: Window is calendar 2026 and has not closed. Interim evidence is printed in full; the path's full marker set (utilization below 70%, crypto absorbing idle GPU capacity, robotics slippage) cannot be finally graded until the year closes. Final grade after Dec 31, 2026.
OPENC1172026-01-05
The call, as published: “3. Bloodbath — correction and stranded assets (25%)”
Window, as published: 2026
State at the audit date, October 29, 2026: Window is calendar 2026 and has not closed. One trigger leg (capex above $400B) is met at the interim; the settling legs (large losses, funding pullbacks, grid reliability failure, correction) have not occurred through Oct 18, 2026. Final grade after Dec 31, 2026.
OPENC1242026-01-26
The call, as published: “Orderly stabilization (~50%):”
Window, as published: the next year (from 2026-01-26)
State at the audit date, October 29, 2026: Window has not closed. Interim evidence runs against orderly stabilization so far: Q2 2026 GAAP results were obscured by the $12,529M escrowed-shares mark-to-market loss (GAAP net loss $11,033M vs non-GAAP income $2,197M), the opposite of traceable earnings. The path can still be rescued by clean Q3/Q4 prints; grade at Jan 26, 2027.
OPENC1252026-01-26
The call, as published: “Disclosure debt (~35%):”
Window, as published: the next year (from 2026-01-26)
State at the audit date, October 29, 2026: Window has not closed. Interim evidence tracks this path: earnings attribution in Q2 2026 was dominated by a $12,529M non-operating mark-to-market item and Altera deconsolidation / non-controlling-interest adjustments, so attribution is not yet clean and repeatable. Final grade at Jan 26, 2027.
OPENC1262026-01-26
The call, as published: “Another reset (~15%):”
Window, as published: the next year (from 2026-01-26)
State at the audit date, October 29, 2026: Window (the next year from Jan 26, 2026) has not closed. Interim: restructuring charges continued in Q2 2026 ($170M) and a fresh DCAI layoff round was reported in July 2026, so the reset leg is tracking, but the path's break condition (structure stable across multiple reporting periods) cannot be judged until the year closes. Grade at Jan 26, 2027.
OPENC1302026-02-09
The call, as published: “Bullish break: ~30% Requires sustained institutional inflows above $50B annually, effective circulating supply below 1M BTC, easing macro pressure, and volatility compression.”
Window, as published: 6–12 Months
State at the audit date, October 29, 2026: Window runs to Feb 2027 and has not closed. Interim state is against this path so far: H1 2026 ETF flows were net negative (about $5B out) rather than on a $50B annual inflow pace, and the effective-circulating-supply leg (below 1M BTC) was not sourced in this pass. Still pending: flows and price through Feb 2027.
OPENC1312026-02-09
The call, as published: “Ranging / neutral: ~45% Partial macro alignment and thinning supply support rallies, but insufficient capital persistence and elevated volatility cap follow-through.”
Window, as published: 6–12 Months
State at the audit date, October 29, 2026: Window runs to Feb 2027 and has not closed. Interim state is broadly consistent with this base case so far (rallies supported but capped, no sustained follow-through in either direction across the full period, elevated volatility in June). Final grade at Feb 2027.
OPENC1322026-02-09
The call, as published: “Bearish tilt: ~25% Dollar strength, tighter liquidity, or renewed outflows reintroduce drawdown dynamics even if longer-term structure remains intact.”
Window, as published: 6–12 Months
State at the audit date, October 29, 2026: Window (6-12 months from Feb 9, 2026) runs to Feb 2027 and has not closed. Interim state includes a genuine drawdown phase in this path's direction (the May-Jun 2026 fall on record ETF outflows and tighter liquidity), followed by a recovery into October, so the bearish tilt describes part of the window but not yet its settled state. Final grade at Feb 2027.
OPENC1332026-02-16
The call, as published: “Expansionary (Activity-Led Scaling): 20–30%”
Window, as published: 6–12 months (from 2026-02-16)
State at the audit date, October 29, 2026: Window runs to Feb 2027 and has not closed. Interim state partially matches this path (agent usage and credit consumption growing, margins improving), with its retention leg against it: net revenue retention eased to 102% rather than trending higher. Still pending: HubSpot's prints through Feb 2027.
OPENC1342026-02-16
The call, as published: “Ranging (Offsetting Forces): 50–60%”
Window, as published: 6–12 months (from 2026-02-16)
State at the audit date, October 29, 2026: Window runs to Feb 2027 and has not closed. Interim state is tracking closest to this base case (seat/customer growth moderating but not contracting, credit adoption growing, retention near current levels at 102%, revenue growth at the top of the mid-to-high teens in constant currency at 17.5%, margins improving rather than materially shifting). Final grade at Feb 2027.
OPENC1352026-02-16
The call, as published: “Constraining (Seat Compression Dominant): 15–25%”
Window, as published: 6–12 months (from 2026-02-16)
State at the audit date, October 29, 2026: Window (6-12 months from Feb 16, 2026) runs to Feb 2027 and has not closed. Interim state shows early pressure in this path's direction (net additions below expectation, retention down a point, guidance trimmed) but not its settled condition: the customer base still grew 14% YoY, seats did not contract in the sourced record, and margins improved rather than coming under pressure. Final grade at Feb 2027.
OPENC1362026-02-17
The call, as published: “Expansionary (Control Deepens): 25–35%”
Window, as published: 6–12 months (from 2026-02-17)
State at the audit date, October 29, 2026: Window runs to Feb 2027 and has not closed. Interim state is tracking toward this path on all four stated legs (AI + Data Cloud ARR grew materially beyond the roughly $1B base to nearly $3.9B; RPO expanded at or above revenue growth; subscription growth of 11.7% sits near the roughly 10% marker; non-GAAP margin of 34.1% sits at the top of the roughly 33-34% range), but under the window-governs rule the grade stays OPEN until Feb 2027.
OPENC1372026-02-17
The call, as published: “Neutral (Stability Holds): 45–55%”
Window, as published: 6–12 months (from 2026-02-17)
State at the audit date, October 29, 2026: Window runs to Feb 2027 and has not closed. Interim state sits above this path on its AI leg: AI + Data ARR of nearly $3.9B is no longer a small percentage marker against an $11.35B quarter, although RPO in line with revenue, stable margins, and no visible pricing deterioration all match the neutral description. Still pending: Salesforce's prints through Feb 2027.
OPENC1382026-02-17
The call, as published: “Constraining (Abstraction Emerges): 15–25%”
Window, as published: 6–12 months (from 2026-02-17)
State at the audit date, October 29, 2026: Window (6-12 months from Feb 17, 2026) runs to Feb 2027 and has not closed. Interim state is the opposite of this path so far (AI ARR grew more than 210% rather than slowing, RPO growth ran at or above revenue growth, and non-GAAP margin held at 34.1% against the roughly 33-34% baseline, with no sourced discounting shift). Final grade at Feb 2027.
OPENC1392026-02-20
The call, as published: “Expansionary: 30–40% Governance deepens as AI-driven workflow volume scales inside the platform.”
Window, as published: 6–12 Month
State at the audit date, October 29, 2026: Window runs to Feb 2027 and has not closed. Interim state partially matches this path (margins held above the 28-29% range at 29.5%, net new ACV expanded, AI governance products are the company's stated growth driver), with one leg short on the latest print: cRPO growth of 21% ran below subscription revenue growth of 24.5% rather than at or above it. Still pending: ServiceNow's prints through Feb 2027.
OPENC1402026-02-20
The call, as published: “Neutral: 40–50% AI adoption continues, but governance economics remain incremental.”
Window, as published: 6–12 Month
State at the audit date, October 29, 2026: Window runs to Feb 2027 and has not closed. Interim state is broadly consistent with this base case (cRPO growing roughly in line with subscription revenue, attach improving gradually on the AI ACV figures, margins steady to slightly above range). Final grade at Feb 2027.
OPENC1412026-02-20
The call, as published: “Constraining: 20–30% Execution coordination begins migrating outward.”
Window, as published: 6–12 Month
State at the audit date, October 29, 2026: Window (6-12 months from Feb 20, 2026) runs to Feb 2027 and has not closed. Interim state does not match this path: cRPO grew 21% alongside 24.5% subscription growth rather than decelerating away from it on migration outward, net new ACV deals rose about 40%, and the non-GAAP margin held at 29.5%, above the recent 28-29% range rather than drifting below it. Final grade at Feb 2027.
OPENC1422026-02-22
The call, as published: “Centralization: 25–30%”
Window, as published: 6–12 months (from 2026-02-22)
State at the audit date, October 29, 2026: Window runs to Feb 2027 and has not closed. Interim state is tracking toward this path (product growth reaccelerated to 37%, above the 30% marker; retention 126%, at or above the 120% marker; management links AI workloads to the acceleration), with one leg short: RPO growth of 30% ran below revenue growth of 35% rather than at or above it. Under the window-governs rule the grade stays OPEN until Feb 2027.
OPENC1432026-02-22
The call, as published: “Neutral: 50–55%”
Window, as published: 6–12 months (from 2026-02-22)
State at the audit date, October 29, 2026: Window runs to Feb 2027 and has not closed. Interim state sits above this path's ranges on its two headline figures (product growth 37% versus the low-to-mid-20% band; retention 126% versus the 115-118% trend), while margin expansion at a steady pace does match. Still pending: whether growth decelerates into the neutral band by Feb 2027.
OPENC1442026-02-22
The call, as published: “Growth Compression: 20–25%”
Window, as published: 6–12 months (from 2026-02-22)
State at the audit date, October 29, 2026: Window (6-12 months from Feb 22, 2026) runs to Feb 2027 and has not closed. Interim state is the opposite of this path so far (product growth accelerated to 37% rather than decelerating below the low-20% range; retention 126% rather than trending toward 110%). One leg matches the path's description: RPO growth of 30% lagged revenue growth of 35%. Final grade at Feb 2027.
OPENC1452026-02-25
The call, as published: “Scenario 1: Business as Usual, Slightly Better Probability: ~50%”
Window, as published: 6 to 12 months (from 2026-02-25)
State at the audit date, October 29, 2026: Window runs to Feb 2027 and has not closed. Interim state is broadly consistent with this path (double-digit revenue and ARR growth, pricing power not visibly broken), with one printed exception: non-GAAP operating margin at 44% sits below the year-earlier 46.3% rather than holding flat. Final grade at Feb 2027.
OPENC1462026-02-25
The call, as published: “Scenario 2: AI Becomes a Revenue Boost Probability: ~25–30%”
Window, as published: 6 to 12 months (from 2026-02-25)
State at the audit date, October 29, 2026: Window runs to Feb 2027 and has not closed. Interim state partially matches this path: AI-first ARR is now disclosed and large (above $650M, up more than 150% YoY), which is the path's monetization-disclosure marker, but sourced evidence of AI features moving customers to higher tiers and accelerating revenue per user is not yet in the interim record at that specificity. Still pending: Adobe's prints through Feb 2027.
OPENC1472026-02-25
The call, as published: “Scenario 3: Creative Tools Become Interchangeable Probability: ~20–25%”
Window, as published: 6 to 12 months (from 2026-02-25)
State at the audit date, October 29, 2026: Window (6-12 months from Feb 25, 2026) runs to Feb 2027 and has not closed. Interim state shows only one leg of this path (non-GAAP operating margin eased from 46.3% to 44%); retention deterioration and prosumer churn at the scale described are not in the sourced interim record, and revenue and ARR grew double digits. Still pending: Adobe's prints through Feb 2027.
OPENC1482026-02-26
The call, as published: “Scenario 1: Commercial Momentum Continues Probability: ~50%”
Window, as published: 6–12 months (from 2026-02-26)
State at the audit date, October 29, 2026: Window runs to Feb 2027 and has not closed. Interim state does not match this path's central figure: US commercial growth printed 149% YoY in Q2 2026, not the mid-to-high 20% sustain the scenario describes, while government steadiness, margin hold, and free cash flow expansion do match. Still pending: whether growth decelerates into this scenario's range by Feb 2027.
OPENC1492026-02-26
The call, as published: “Scenario 2: AI Deployment Accelerates Probability: ~30%”
Window, as published: 6–12 months (from 2026-02-26)
State at the audit date, October 29, 2026: Window runs to Feb 2027 and has not closed. Interim state is tracking strongly toward this path (larger contracts: 220 deals of $1M+, RDV up 124%, free cash flow margin rising to a $1.22B quarter at a 62% adjusted operating margin), but under the window-governs rule the grade stays OPEN until Feb 2027.
OPENC1502026-02-26
The call, as published: “Scenario 3: Deployment Simplifies Probability: ~20%”
Window, as published: 6–12 months (from 2026-02-26)
State at the audit date, October 29, 2026: Window (6-12 months from Feb 26, 2026) runs to Feb 2027 and has not closed. Interim state is the opposite of this path so far (commercial growth accelerated to 149% YoY rather than slowing below the mid-20% range, and margins expanded rather than flattening), but the final grade waits on the window. Still pending: Palantir's prints through Feb 2027.
OPENC112026-02-28
The call, as published: “For Anthropic and its frontier peers: Institutional embedding (~45%)”
Window, as published: the next one to two years (from 2026-02-28)
State at the audit date, October 29, 2026: Stated window of one to two years from Feb 28, 2026 has not closed; grading now would require shortening the article's own horizon.
OPENC122026-02-28
The call, as published: “Political friction, moderated growth (~35%)”
Window, as published: the next one to two years (from 2026-02-28)
State at the audit date, October 29, 2026: Stated window of one to two years from Feb 28, 2026 has not closed; grading now would require shortening the article's own horizon.
OPENC132026-02-28
The call, as published: “Compound shock (~20%)”
Window, as published: the next one to two years (from 2026-02-28)
State at the audit date, October 29, 2026: Stated window of one to two years from Feb 28, 2026 has not closed; grading now would require shortening the article's own horizon.
OPENC1512026-03-01
The call, as published: “Expansionary Liquidity — 35% Liquidity stabilizes or eases. Real yields soften. ETF inflows resume consistently. Basis spreads widen back toward prior 15–25% ranges. Structured capital re-engages.”
Window, as published: 12–24 Months
State at the audit date, October 29, 2026: Window runs to Mar 2027-2028 and has not closed. Interim state printed in the settling event: inflows did resume consistently for two months (Mar-Apr 2026), then reversed to record outflows in June, so the path's full condition set (including basis spreads widening back toward 15-25%, which this pass did not source) is not the interim state. Still pending: the window's settled liquidity state by Mar 2027-2028.
OPENC1522026-03-01
The call, as published: “Ranging / Transitional — 40% Liquidity remains mixed. ETF flows oscillate. Basis spreads stay compressed but functional. Bitcoin trades with macro sensitivity but without persistent directional pressure.”
Window, as published: 12–24 Months
State at the audit date, October 29, 2026: Window runs to Mar 2027-2028 and has not closed. Interim state is closest to this path so far (flows oscillating, no persistent directional pressure across the full period), but under the window-governs rule the grade stays OPEN until the window closes.
OPENC1532026-03-01
The call, as published: “Constraining Liquidity — 25% Liquidity tightens further. ETF outflows extend beyond the recent ~$3.8B window. Basis compresses materially. Structured unwind continues.”
Window, as published: 12–24 Months
State at the audit date, October 29, 2026: Window (12-24 months from Mar 1, 2026) runs to Mar 2027 at the earliest and has not closed. Interim state printed in the settling event: the June 2026 record outflow month extended well beyond the article's roughly $3.8B reference window at the time, which is this path's direction, but flows oscillated before and after it. Still pending: whether tightening persists as the window's settled state by Mar 2027-2028.
OPENC1582026-03-11
The call, as published: “Expansionary: 45% probability AI infrastructure spending continues expanding and electricity availability becomes the pacing factor for new data centers.”
Window, as published: next 6–12 months
State at the audit date, October 29, 2026: Window runs to Mar 2027 and has not closed. Interim state is tracking toward this path (spending expanding, electricity named as the pacing factor in Oct 2026 reporting), but under the window-governs rule the grade is OPEN until the window closes in Mar 2027.
OPENC1592026-03-11
The call, as published: “Ranging: 35% Efficiency improvements delay the pressure on power systems.”
Window, as published: next 6–12 months
State at the audit date, October 29, 2026: Window runs to Mar 2027 and has not closed. Interim state printed in the settling event: spending and power pressure both kept rising through Oct 2026, with no sourced evidence that efficiency gains have yet delayed the pressure on power systems at system scale. Still pending: the balance of efficiency gains against load growth through Mar 2027.
OPENC1602026-03-11
The call, as published: “Constraining: 20% A physical bottleneck appears earlier than expected.”
Window, as published: next 6–12 months
State at the audit date, October 29, 2026: Window runs to Mar 2027 (6-12 months from Mar 11, 2026) and has not closed. Interim state printed in the settling event: grid and equipment constraints are visibly binding (128-144 week transformer lead times, about half of planned 2026 US capacity delayed), which is this path's stated mechanism, but a final grade waits on the window. Still pending: whether bottlenecks slow deployments at the scale the path describes by Mar 2027.
OPENC1672026-03-21
The call, as published: “Base case (55–70%)”
Window, as published: 6–12 months (from 2026-03-21)
State at the audit date, October 29, 2026: OPEN because the window runs to Mar 2027. Pending: whether higher-bandwidth products keep ramping on schedule with stable or improving margins through the window's end.
OPENC1682026-03-21
The call, as published: “Stress case (30–45%)”
Window, as published: 6–12 months (from 2026-03-21)
State at the audit date, October 29, 2026: OPEN because the 6-12 month window runs to Sep 2026-Mar 2027. Pending: whether the 1.6T-to-3.2T ramp slows or margins compress later in the window.
OPENC1692026-03-24
The call, as published: “Scenario 1: Controlled Pressure Absorption Probability: 60–70%”
Window, as published: 6–12 month horizon (from 2026-03-24)
State at the audit date, October 29, 2026: OPEN because the 6-12 month window runs to Mar 2027. Pending: the full-window state, including whether margins settle back toward the stated band; the overshoot is recorded as an interim deviation in the favorable direction, not graded early.
OPENC1702026-03-24
The call, as published: “Scenario 2: Constraint Escalation Probability: 30–40%”
Window, as published: 6–12 month horizon (from 2026-03-24)
State at the audit date, October 29, 2026: OPEN because the window runs to Sep 2026-Mar 2027. Pending: whether yield challenges at higher speeds widen the supply gap beyond 30% and slow deployment before the window closes; nothing in the evidence so far points that way.
OPENC1732026-03-28
The call, as published: “Expansionary: 65% probability.”
Window, as published: 6–12 months (from 2026-03-28)
State at the audit date, October 29, 2026: OPEN because the 6-12 month window runs to Mar 2027. Pending: whether backlog converts into revenue closer to order demand with hyperscaler mix still rising, which would settle this path true.
OPENC1742026-03-28
The call, as published: “Ranging / Neutral: 25%.”
Window, as published: 6–12 months (from 2026-03-28)
State at the audit date, October 29, 2026: OPEN because the window runs to Mar 2027. Pending: whether backlog stabilizes and converts unevenly (this path), keeps expanding (C175), or converts toward order demand (C173) by the window's end.
OPENC1752026-03-28
The call, as published: “Constraining: 10%.”
Window, as published: 6–12 months (from 2026-03-28)
State at the audit date, October 29, 2026: OPEN because the 6-12 month window runs to Sep 2026-Mar 2027; per the grading rules a path inside its window stays OPEN even when its marker has triggered early. Pending: whether backlog keeps expanding past $7B with revenue lagging, or conversion (the expansionary marker) takes over before the window closes.
OPENC1792026-04-13
The call, as published: “Expansionary: 40% probability.Sustained hyperscaler capex ($820-860B+ in 2027) forces the coordination problems to get solved; backlog starts turning into revenue as the physical systems finally run together smoothly.”
Window, as published: Long-term (6-12 months)
State at the audit date, October 29, 2026: OPEN because the 6-12 month window runs to Apr 2027 and the path turns on 2027 capex and backlog conversion that cannot be observed yet.
OPENC1802026-04-13
The call, as published: “Ranging / Neutral: 35% probability.Deployment improves unevenly across regions and hyperscalers; returns stay concentrated in coordination and efficiency layers while timing-sensitive segments lag.”
Window, as published: Long-term (6-12 months)
State at the audit date, October 29, 2026: OPEN because the 6-12 month window has not closed. Pending: whether uneven deployment with concentrated returns, rather than solved coordination (C179) or persistent structural delay (C181), describes the full window.
OPENC1812026-04-13
The call, as published: “Constraining: 25% probability.Power and component constraints persist at scale, extending the wait; backlog-to-revenue conversion stays structurally delayed, concentrating durable value in early-paid layers only.”
Window, as published: Long-term (6-12 months)
State at the audit date, October 29, 2026: OPEN because the long-term window runs to Oct 2026-Apr 2027. Pending: whether backlog-to-revenue conversion stays structurally delayed through the window's end or a turning point arrives.
OPENC1852026-05-06
The call, as published: “Bear case: 40%. This is the leading long-term risk case until Riot proves financial improvement.”
Window, as published: Long-term (6-12 months)
State at the audit date, October 29, 2026: OPEN because the 6-12 month window runs to Nov 2026-May 2027. Pending: whether financial improvement is proven within the window; if it is not, this path (the article's leading long-term risk case at 40%) is the one that grades true.
OPENC1862026-05-06
The call, as published: “Base case: 35%. Riot remains an incomplete transition.”
Window, as published: Long-term (6-12 months)
State at the audit date, October 29, 2026: OPEN because the 6-12 month window has not closed. Pending: whether weak treasury strength and negative operating cash flow still block a full structural upgrade at the window's end, or the contracted leases convert fast enough to change the state.
OPENC1872026-05-06
The call, as published: “Bull case: 25%. Riot proves that its power assets can become durable AI/HPC infrastructure revenue.”
Window, as published: Long-term (6-12 months)
State at the audit date, October 29, 2026: OPEN because the long-term window runs to Nov 2026-May 2027. Pending: whether contracted megawatts become durable non-mining revenue with improving operating cash flow, stronger treasury coverage, and limited dilution.
OPENC1952026-06-07
The call, as published: “HUT delivers into 2027, Bitcoin remains supportive, the pipeline converts into additional contracted demand, and the market rewards the company with a higher infrastructure multiple.”
Window, as published: next 12 to 18 months
State at the audit date, October 29, 2026: OPEN because the window runs to Jun-Dec 2027 and the path's settling test is delivery into 2027 with a higher infrastructure multiple. Pending: on-time energization, pipeline conversion, and whether the market re-rates HUT as a scarce power platform.
OPENC1962026-06-07
The call, as published: “The company executes, but not cleanly. Timelines slip modestly, Bitcoin remains volatile, and investors wait for cash flow before assigning additional value to the AI-infrastructure story.”
Window, as published: next 12 to 18 months
State at the audit date, October 29, 2026: OPEN because the stated window (next 12 to 18 months, to Jun-Dec 2027) has not closed; the grade follows the window even though the follow-up chain and the tape both show the base case tracking. Pending: whether modest slips and Bitcoin volatility, rather than clean delivery or a 12-month slip, describe the full window.
OPENC1972026-06-07
The call, as published: “Construction slips by 12 months or more, capex rises materially, AI demand cools, financing becomes more dilutive, or Bitcoin weakness compounds the pressure.”
Window, as published: next 12 to 18 months
State at the audit date, October 29, 2026: OPEN because the window runs to Jun-Dec 2027. The bear path requires a 12-month-plus construction slip, materially higher capex, cooling AI demand, more dilutive financing, or compounding Bitcoin weakness leaving HUT treated as a miner with an unfinished AI story; none has occurred, and the financing and contracting markers so far point the other way.
OPENC1982026-06-11
The call, as published: “Scenario 1: Expansionary Integration (42–48%)”
Window, as published: The next few years (the article's next-cycle horizon)
State at the audit date, October 29, 2026: OPEN because the article's window ('the next few years') has not closed. Pending: whether stablecoin settlement, tokenized-Treasury collateral use, and ETF normalization compound into business and institutional dependency on crypto rails. Settles at the end of the article's next-cycle horizon; the article states no date.
OPENC1992026-06-11
The call, as published: “Scenario 2: Functional but Episodic Adoption (38–42%)”
Window, as published: The next few years (the article's next-cycle horizon)
State at the audit date, October 29, 2026: Window governs: the scenario settles over the next few years, which have not elapsed. What is pending: whether adoption stays fragmented and episodic through the cycle, versus deepening into Scenario 1 integration or breaking into Scenario 3 reversal (graded in other chunks / C200).
OPENC2002026-06-11
The call, as published: “Scenario 3: Constraining Reversal (12–18%)”
Window, as published: The next few years (the article's next-cycle horizon)
State at the audit date, October 29, 2026: Window governs: the scenario settles over the article's next-cycle horizon (the next few years), which has not closed. What is pending: the six named reversal conditions occurring together. Distinguished from the AAPL grid (C201-C203): this scenario names concrete co-occurring events and a horizon, so it is OPEN rather than UNSETTLED.
OPENC2042026-08-08
The call, as published: “Base Case (70% Probability): 8.5 to 9.5 Million bpd (~40% to 45% Bypass).”
Window, as published: 24 months from August 2026
State at the audit date, October 29, 2026: Window governs: the base case (70%) settles at the end of the 24-month horizon. What is pending: total crude bypass capacity at Aug 2028 against the 8.5-9.5 million bpd band, with LNG flows remaining inside the Persian Gulf.
OPENC2052026-08-08
The call, as published: “Accelerated Shift (20% Probability): 11.5 to 12.5 Million bpd (~55% to 60% Bypass).”
Window, as published: 24 months from August 2026
State at the audit date, October 29, 2026: Window governs: the accelerated-shift path settles at the end of the 24-month horizon. What is pending: total crude bypass capacity at Aug 2028 against the 11.5-12.5 million bpd band.
OPENC2062026-08-08
The call, as published: “Systemic Failure (10% Probability): Under 7.5 Million bpd (Under 35% Bypass).”
Window, as published: 24 months from August 2026
State at the audit date, October 29, 2026: Window governs: the systemic-failure path settles at the end of the 24-month horizon. What is pending: total crude bypass capacity at Aug 2028 against the under-7.5 million bpd (under 35%) line.
OPENC2072026-08-08
The call, as published: “Crude bypass capacity reaches 60% to 70%, partially protecting oil exports while gas flows slowly begin to adapt.”
Window, as published: Months 24 to 60 from August 2026
State at the audit date, October 29, 2026: Window governs: this phase settles in months 24-60 from August 2026. What is pending: crude bypass capacity reaching 60% to 70% of Hormuz flows on completed pipelines and greenfield LNG.
OPENC2082026-08-09
The call, as published: “By 2027, the sheer volume of programmatic machine-to-machine transactions will force a complete split in digital asset infrastructure.”
Window, as published: By 2027
State at the audit date, October 29, 2026: Window governs: the call settles by 2027. What is pending: consumer rails remaining bound to synchronous compliance checks while machine commerce migrates into hardware-enclosed state channels backed by institutional underwriting vaults.
OPENC2092026-08-10
The call, as published: “Base Case: Range-Bound Consolidation (60% Probability | $60k–$75k Target): TIPS yields stay anchored near 2.41%, Fed Net Liquidity remains suppressed near $5.84 trillion, and global M2 velocity stays sluggish at +1.15%.”
Window, as published: Through 2027
State at the audit date, October 29, 2026: Window governs: the base path settles through 2027, so it is OPEN, but its price leg is failing on interim evidence: Bitcoin left the $60k-$75k range upward within two weeks of publication (first close above it on Aug 21, 2026) and has not returned to it through Oct 17, 2026. What is pending: the through-2027 record on price and on the stated TIPS, Fed Net Liquidity, and M2 levels. The Aug 22, 2026 follow-up restated the framework without grading this path.
OPENC2102026-08-10
The call, as published: “Bull Case: The Monetary Catch-Up (25% Probability | $100k–$170k+ Target): All four liquidity gates trigger—TIPS yields break below 1.75%, Fed Net Liquidity expands, global M2 growth accelerates above +2.50%, and DXY drops below 96.0.”
Window, as published: Through 2027
State at the audit date, October 29, 2026: Window governs: the bull path settles through 2027. What is pending: all four liquidity gates triggering together (TIPS below 1.75%, Fed Net Liquidity expanding, global M2 growth above +2.50%, DXY below 96.0) with Bitcoin rallying into $100k-$170k+. The Aug 22, 2026 follow-up claimed the framework flipped under Treasury yield caps; the audit records that claim and does not adopt it, since the gates as stated had not all verifiably triggered.
OPENC2112026-08-10
The call, as published: “Bear Case: Real-Yield Compression Spike (15% Probability | $50k–$58k Target): Commodity input inflation pushes TIPS yields above 2.75% while Fed Net Liquidity contracts below $5.50 trillion.”
Window, as published: Through 2027
State at the audit date, October 29, 2026: Window governs: the bear path settles through 2027. What is pending: TIPS yields above 2.75% together with Fed Net Liquidity contracting below $5.50 trillion and Bitcoin falling into $50k-$58k. The Aug 22, 2026 follow-up restated the gates without grading this path.
OPENC2122026-08-13
The call, as published: “1.6T pluggable transceivers handle early 1.6T cluster builds, but hyperscalers will deploy Broadcom’s Tomahawk 6-Davisson CPO switches in volume at scale-out tiers to prevent switch power consumption from exceeding 2kW per chassis.”
Window, as published: 2026-2027
State at the audit date, October 29, 2026: Window governs: Milestone 1 settles across 2026-2027. Interim evidence shows previews and early production, not the volume scale-out deployment the milestone requires. What is pending: hyperscaler volume deployment of TH6-Davisson CPO switches while 1.6T retimed pluggables peak.
OPENC2132026-08-13
The call, as published: “Pre-packaging wafer probing becomes mandatory across every advanced foundry, allowing FormFactor (FORM) and Keysight (KEYS) to expand gross margins toward 50%+.”
Window, as published: 2026-2027
State at the audit date, October 29, 2026: Window governs: Milestone 2 settles across 2026-2027. What is pending: mandatory pre-packaging wafer-level photonic probing across advanced foundries and FORM/KEYS gross margins expanding toward 50%+.
OPENC2142026-08-13
The call, as published: “Because InP lasers suffer exponential degradation when operated at temperatures above 85°C, hyperscalers will standardize on External Light Source Small Form-factor Pluggable (ELSFP) architectures.”
Window, as published: 2027-2028
State at the audit date, October 29, 2026: Window governs: Milestone 3 settles in 2027-2028. What is pending: hyperscaler standardization on ELSFP architectures decoupling lasers from hot switch dies.
OPENC2152026-08-13
The call, as published: “Optical I/O engines will replace copper backplanes in GPU-to-GPU NVLink fabrics, expanding silicon photonics silicon content per rack by over $30,000.”
Window, as published: 2027-2028
State at the audit date, October 29, 2026: Window governs: Milestone 4 settles in 2027-2028. What is pending: CPO expansion from scale-out Ethernet into scale-up GPU fabrics and the $30,000+ per-rack content expansion.
OPENC2502026-08-20
The call, as published: “Macro Liquidity Trigger (3-12 months): Buybacks sustained at or above $4 billion per session alongside weekly spot ETF net inflows holding between $300M and $700M confirm the baseline demand required to push prices toward the $70,000 liquidity pocket. Invalidation: if the 30-year breaks above 5.23% and the 10-year holds above 4.70% despite sustained $4B+ buybacks.”
Window, as published: 3-12 months from Aug 20, 2026; closes Aug 20, 2027.
State at the audit date, October 29, 2026: OPEN: the call's window runs to Aug 20, 2027 and its conditions are persistence conditions across that window. Interim evidence is favorable (Bitcoin crossed and has held above the $70,000 pocket) but the grade cannot settle inside the window.
OPENC2172026-08-24
The call, as published: “🔺 For the next 120 to 180 days, Scott Bessent’s $400 billion TGA drawdown provides the cleanest, most predictable liquidity tailwind digital assets will see this year.”
Window, as published: Next 120 to 180 days (from 2026-08-24; the article's 4-to-6 month clock)
State at the audit date, October 29, 2026: Window has not closed: the 120-180 day clock from Aug 24, 2026 runs to about Dec 22, 2026 through Feb 20, 2027. Interim evidence runs against the call so far (the balance rose into October rather than drawing down), printed here at the same size as the grade. What is pending: a TGA drawdown toward the $550B floor releasing roughly $400B into reserves before the clock ends. No follow-up in the index answers this article, but no settling event has occurred, so follow_up_missing is false.
OPENC172026-08-29
The call, as published: “Base Case: Successful Sovereign Realignment (65% Probability)”
Window, as published: Over coming quarters (from 2026-08-29)
State at the audit date, October 29, 2026: Stated window has not closed.
OPENC182026-08-29
The call, as published: “Bear Case: Supply Friction & Yield Breakout (35% Probability)”
Window, as published: Over coming quarters (from 2026-08-29)
State at the audit date, October 29, 2026: Stated window has not closed.
OPENC2192026-08-31
The call, as published: “As cash runways compress toward the 2027–2028 window, public small-caps with high monthly burn rates will face severe valuation compression.”
Window, as published: 2027–2028
State at the audit date, October 29, 2026: Window governs: the call settles in the 2027-2028 window. What is pending: whether high-burn public small-cap quantum/hardware names undergo severe valuation compression and distressed asset pickups in that window.
OPENC202026-09-21
The call, as published: “Kill condition: if the 200ms step activates and SOL fails to take out $119.07 within 30 days, the speed premium is priced in and this leg is wrong.”
Window, as published: 30 days from activation of the 200ms step (still pending at publication, 2026-09-21)
State at the audit date, October 29, 2026: Activation occurred Oct 9, 2026; the article's 30-day window closes Nov 8, 2026. Interim state printed in full: no takeout yet and price falling, so the leg is tracking toward its own kill condition but has not reached it.
OPENC222026-09-21
The call, as published: “Kill condition: if Strategy goes a full quarter without buying while BTC falls, the accumulator bid is gone and this read is wrong.”
Window, as published: A full quarter (from 2026-09-21)
State at the audit date, October 29, 2026: The kill condition requires a full quarter; one month in, the accumulator bid is intact on the filing record. Final grade at Dec 21, 2026.
OPENC2252026-10-04
The call, as published: “HUT below $40, 25%: the stock would have to fall more than half from $86.10. Possible in a crypto drawdown. Ho delivers all 1.5M shares, effectively out at ~$38.88. His insurance pays.”
Window, as published: By May 17, 2027 (valuation window May 13-17, 2027)
State at the audit date, October 29, 2026: Window has not closed: the below-$40 path settles on the May 13-17, 2027 valuation window at the May 17, 2027 maturity. What is pending: HUT's settlement VWAP against the $40 floor in May 2027.
OPENC2262026-10-04
The call, as published: “HUT between $40 and $221, 60%: where the stock trades today, and the 52-week high of $140.80 sits well under the cap. The base read: Ho delivers a fraction of the shares and keeps the appreciation above $40.”
Window, as published: By May 17, 2027 (valuation window May 13-17, 2027)
State at the audit date, October 29, 2026: Window has not closed: the base path (60%) is tracking inside its band on interim prices, but it settles only on the May 13-17, 2027 VWAP at the May 17, 2027 maturity. What is pending: the settlement VWAP and the resulting fractional share delivery.
OPENC2272026-10-04
The call, as published: “HUT above $221, 15%: requires roughly a 157% rally from the September 30 close. Ho's upside stops at the cap; JPMorgan keeps everything past $221.”
Window, as published: By May 17, 2027 (valuation window May 13-17, 2027)
State at the audit date, October 29, 2026: Window has not closed: the path settles on the May 13-17, 2027 valuation window at the forward's May 17, 2027 maturity. What is pending: HUT's settlement VWAP against the $221 cap in May 2027.
OPENC2292026-10-12
The call, as published: “The most probable path from here, roughly 70% by our judgment: the funding machine keeps running into the IPO, and the public S-1 is the first real test of every number in this piece.”
Window, as published: Into the Anthropic IPO (S-1 expected public by late October; marketing as soon as the week of November 9, trading before Thanksgiving)
State at the audit date, October 29, 2026: Window still open: the call runs into the Anthropic IPO, whose public S-1 (expected by late October ahead of November 9 marketing) had not appeared at the audit date. What is pending: the public S-1 filing and whether the funding machine keeps running into it; settles when the S-1 becomes public or the IPO timetable fails.
OPENC2342026-10-25
The call, as published: “The most probable outcome for the week ahead: Bitcoin stays under the range it left. The break holds. No daily close this week reclaims $81,300. What would change our mind on the break: a close back above $81,300 on any day this week.”
Window, as published: The week of October 26-30, 2026 (the article names the Friday Oct 30 close as the settlement point)
State at the audit date, October 29, 2026: Window closes with the Oct 30, 2026 close, after this addendum's audit date. Interim closes are consistent with the call (no reclaim through Oct 28). Grade after the Oct 30, 2026 close.
OPENC2392026-10-29
The call, as published: “The stack stalls, 45 to 60%. Nothing switches on inside this horizon. The law waits for its start date, the market ends the quarter where it began, and the funding share does not move.”
Window, as published: 1-3 months from Oct 28, 2026; closes Jan 28, 2027. Named triggers: Nov 30, 2026 Federal Reserve GENIUS Act rules comment close; monthly supply print against $299.1B
State at the audit date, October 29, 2026: In settleable form (window, baselines $299.1B and 0.64%, and the settling measure all printed in the piece, unlike the AAPL grid C201-C203) with the window still running; interim state is the baseline itself and nothing has settled. FOLLOW-UP MISSING not flagged: no settling event has occurred.
OPENC2402026-10-29
The call, as published: “The stack grows, 20 to 30%. Monthly supply prints turn up, the Federal Reserve's rules move from proposal toward final, and the funding share moves above 0.64% before the law takes effect.”
Window, as published: 1-3 months from Oct 28, 2026; closes Jan 28, 2027
State at the audit date, October 29, 2026: Settleable form, window running; no monthly print since the baseline has landed and the share has not moved above 0.64% on any print to date.
OPENC2412026-10-29
The call, as published: “The stack shrinks, 15 to 30%. Supply falls for a second year, the onshore build stalls in court, and the funding share slips below 0.64% on the same bills and repos count.”
Window, as published: 1-3 months from Oct 28, 2026; closes Jan 28, 2027
State at the audit date, October 29, 2026: Settleable form, window running; the share has not slipped below 0.64% on any print to date; the CME v. CFTC suit in its grounds is live and undecided, which is grounds, not settlement.
OPENC2422026-10-29
The call, as published: “The stack grows, 35 to 50%. The law switches on, the rulebooks land, and issuer buying resumes at the fast pace of the trend years, so the funding share climbs off its floor and supply holds above its baseline through the year.”
Window, as published: 6-12 months from Oct 28, 2026; final grade at the window's close, Oct 28, 2027, unless the printed trigger settles it earlier
State at the audit date, October 29, 2026: Settleable form (window, baselines, and the two-release trigger all printed), window running; no Treasury release since the set date has tested the trigger.
OPENC2432026-10-29
The call, as published: “The stack stalls, 30 to 45%. The stack grows at about the speed of the debt itself, the share stays under 1%, and the doctrine remains a statement with a small machine under it.”
Window, as published: 6-12 months from Oct 28, 2026; final grade at the window's close, Oct 28, 2027
State at the audit date, October 29, 2026: Settleable form, window running; the interim state (share at its 0.64% baseline, under 1%) is consistent with the leg one day into a 6-12 month window, and consistency at the start is not settlement.
OPENC2442026-10-29
The call, as published: “The stack breaks, 10 to 30%. A run on a large coin, a court ruling against the onshore contracts, or a rulebook that never lands breaks the chain, and issuers sell bills into a falling market instead of buying.”
Window, as published: 6-12 months from Oct 28, 2026; final grade at the window's close, Oct 28, 2027, or on a break event inside the window
State at the audit date, October 29, 2026: Settleable form, window running; no break event has occurred; the CME suit is live (filed Jun 18, 2026; CFTC moved to dismiss Oct 16, 2026), which keeps the leg live without settling it.